Pursuant to the requirements of Law 309/2006 Coll. on providing of other conditions of the safety and protection of health at work, the principal of the construction shall be obliged to arrange the coordinator of BOZP on executing the construction and to bind all contractors to the cooperation with the coordinator of BOZP.
Preparatory stage of the construction
The principal of the construction shall be obliged to arrange on the preparatory stage of the construction the coordinator of BOZP and preparing the Plan of BOZP for constructions where works with increased risk as per the Directive of the Government 591/2006 Coll. will be performed during the course of the construction, or where the extent of the construction in accordance with § 15 of Law 309/2006 Coll, is satisfied.
Stage of the execution of the construction
The principal of the construction shall be obliged to arrange the coordinator of BOZP for the stage of the execution for such constructions where two and more contractors are active who obtained the Building Permit after January 1, 2007, and for which the following limits of the volume of the constructions are exceeded:
• |
for which the total estimated period of the duration of the works and activities is longer than 30 working days, on which more than 20 individuals will be working at site at a time for a period longer than 1 day |
• |
for which the total planned amount of works and activities during the execution of the work exceeds 500 working hours upon a conversion to one individual |
|